Liquidity Services Brands

描述

货品号

3407-2257

条件

未使用的

资产编号

25-49FS

2023 fall 2024 spring Modular Home:

• A team of 20 freshman students designed, drew, and then fabricated this modular tiny house.
• The building comes apart in 4 different modules (3 slabs on the first floor and 2 upper module).
• The total footprint of the building is 16’x18’
• The total height of the building is under 19’ tall.
• The total heated sq. ft. is around 300 square feet.
• Each module is under 8’-6” wide, 20’ long, and 11’ tall allowing each module to fit onto a trailer and to be shipped without any special transportation permitting.
• The foundations are made from concrete and steel.
• The lower modules were framed with typical wood framing.
• The upper modules were framed with c-channel and tube steel. They were welded together to create a welded rigid frame.
• The exterior wall skin is a combination of metal panels, wood accents, and fiber cement board.
• The roofing is screw down metal panels and or EPDM.
• The interior is partially finished, the wiring has been pulled and panel installed.
• The buyer is responsible for loading and transportation. The buildings must be removed within 30 days of the end of the sale. We will provide other documentation and assistance for disassembling and loading.

For additional information please call Charles Beckham at 601-575-6113.

SOLD AS IS WHERE IS
Note: Please inspect items prior to placing a bid.


ONCE THE ITEM HAS BEEN REMOVED FROM THE SELLERS LOCATION; ALL SALES ARE FINAL.



PLEASE REVIEW THE SELLERS TERMS AND CONDITIONS OF SALE.

查验

Inspection. Most assets offered for sale are used and may contain defects not immediately detectable. Bidders may inspect the property prior to bidding. Bidders must adhere to the inspection dates and times indicated in the asset description. See special instructions on each asset page for inspection details.

付款

PAYMENT MUST BE MADE ONLINE-- To make online payment, Log into your GovDeals account and select “My Bids”. Please follow the instructions there.
Payment in full is due not later than five (5) business days from the time and date of the Buyers Certificate. Payment must be made electronically through the GovDeals Website. Payment Methods are listed above.

移出

All assets must be removed within ten (10) business days from the time and date of issuance of the Buyer’s Certificate. Purchases will be released only upon receipt of payment as specified. Successful bidders are responsible for loading and removal of any and all property awarded to them from the place where the property is located as indicated on the website and in the Buyer’s Certificate. The Buyer will make all arrangements and perform all work necessary, including packing, loading and transportation of the property. Under no circumstances will Seller assume responsibility for packing, loading or shipping. See special instructions on each asset page for removal details. A daily storage fee of $10.00 may be charged for any item not removed within the ten (10) business days allowed and stated on the Buyer’s Certificate.

特别说明

附加信息

第一次竞标?请查看我们的 条款和条件.

如需进一步帮助,请查看我们的 常见问题.

将您的剩余库存转化为现金

价廉物美的二手资产交易平台 GovDeals !

立即开始